Home >> News

The installation of tube settler(2)

Apr. 14, 2017


Lamella Plate for Clarifier


Here I continue to share the installation of tube setter.

4. the install at the sedimentation tank

The hot pick packing after packing unit in the upper bracket is assembled from left to right. 60 ° angle remains unchanged, the order of each unit during assembly to proper compression, assembled to the far right if size is not just right, you need to be assembled until after packing hot pick in place in accordance with the size of the sheets inclined tube

5. The upper portion of fixed lamella tube settler

Since tube settler water accounted for slightly less than 0.92, tuber settler plate in the pool at the top of the packing assembly in place need direction from left to right to pull φ10mm round steel reinforcement (upper portion of each packing unit requires two round through) , bar ends firmly secured in the sedimentation tank wall can be well prevented inclined tube fill loose floating phenomenon may occur during initial use after installing bar, bar the use of coal tar epoxy.

Learn more lamella plate for clarifier via www.coolingtowerinfill.com.