Home >> News

The installation of tube settler(1)

Apr. 11, 2017

Tube setters are used in cooling tower, do you know the installation of lamella plate?


Lamella Plate for Clarifier


1. Sedimentation tank bottom sludge pipe installation

Sedimentation tank installation order ships starting from the bottom to complete the installation of the bottom mud pipeline system, to ensure that meet the design requirements mud pipe openings, stable fixation, check and correct, allowed into the next step of installation

2. Complete hexagonal tube settler plate bracket

According Sedimentation tank filler bracket construction plans, the first filler bracket in place, check that all solid weld junction, the stent is strong enough to withstand the weight of the filler, and completed embalmed in the stent surface

3. Complete lamella tube settler connection

Press the lamella tube settler connection method each inclined tube filler packaged as two separate contact means hot, hot after the completion of two units connected as 1m2, complete presence on the ground after hot then neatly stacked (maintaining a small number of scattered pieces alternate)